Julkaistu
21.08.2026
Avoinna tarjouksille
21.08.2026
Määräaika
27.08.2026
IIIAC Operational Generative AI & Workforce Enablement Suite
Suljettu·Oct 2
G2 Access Control System Lifecycle
Myönnetty·Sep 22
Handheld Scanners
Myönnetty·Sep 9
Handheld Scanners
Myönnetty·Sep 3
III AC Education Services
Suljettu·Aug 12
13th ACSC Stratasys Origin Two and Stratasys F370CR 3D Printers
Suljettu·Jul 29
Prototype Operational Modeling Framework for Manifest Feasibility in support of NASA KSC Spaceport Digital Twin
Suljettu·Sep 15
MIT Collaborative Research
Suljettu·Sep 14
Radio-Frequency (RF) Systems for the Electron Ion Collider (EIC)
Suljettu·Sep 9
Completion, validation, and Spaceport Digital Twin (SDT) integration of the existing prototype SUMO-based Spaceport Traffic Model in support of NASA Kennedy Space Center (KSC), Spaceport Integration & Services (SI) Directorate
Suljettu·Sep 2
Dynamic Genome: Mitochondrial CHIP Calling
Suljettu·Aug 27
Subject matter expert (SME) for the use of thigh cuffs developed by SME
Suljettu·Aug 25
SBH-02201602-Power and Cooling Upgrade
Avoinna tarjouksille·Oct 30
Tree Pruning
Myönnetty·Oct 30
Programmable Paper Cutter and Five Year Maintenance
Myönnetty·Oct 30
Queensboro Bridge Ramps Transfer of Development Rights
Avoinna tarjouksille·Oct 30
Commercial Waste Zones Outreach Staffing
Myönnetty·Oct 30
DevOps Engineer (IT Production Support)
Myönnetty·Oct 30
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.