The court surface is due for renewal as part of Waikato District Council’s planned asset lifecycle and forward work programme. While there are no major structural failures present, the asphalt shows widespread age-related cracking and surface wear consistent with long-term use and exposure. The project aligns with council’s objective to maintain safe, fit for purpose recreational facilities, reduce ongoing maintenance costs, and extend the service life of key community sporting assets. Key outcomes This RFT aims to achieve the following outcomes: • Identify a contractor who has a proven track record for delivery of high-quality projects, on time and within budget • Identify a contractor that has direct experience with projects of a similar size and scope • Identify a contractor that has the capacity and required plant and resources available to deliver the court renewal • Identify a contractor who has the relevant Health and Safety pre-qualifications
Julkaistu
18.09.2026
Avoinna tarjouksille
18.09.2026
Määräaika
13.10.2026
Lake Rotokauri Walkway
Avoinna tarjouksille·Oct 14
Tamahere Drive Pavement Rehabilitation and Urban Upgrade– Physical Works
Suljettu·Sep 29
Strengthening of Tahuna Road Bridges
Suljettu·Sep 25
Munro Road Resilience and Urban Upgrade
Suljettu·Sep 23
Munro Road Resilience Improvements
Suljettu·Sep 11
Te Kauwhata Walkway
Suljettu·Sep 11
746-27-261-PS - Kelston to New Lynn Cycling and Walking Connections
Suljettu·Oct 13
CON001926-G Whakatane Future Proof Stage 4A: Flood Gates
Suljettu·Oct 9
CON001927 - Whakatāne Project Future Proof - Stage 4B
Suljettu·Oct 1
Ohineangaanga Stream Remediation Work / Erosion Repairs
Suljettu·Aug 20
Ohineangaanga Stream Remediation Work / Erosion Repairs
Suljettu·Aug 19
CON001926 - Whakatane Project Future Proof - Stage 4A
Suljettu·Aug 3
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.