The main purpose with the major overhaul is to ensure that the unit is in a condition where it can be oper-ated safely, reliably and efficiently. Today there are challenges with temperature differences between the lower casing and the upper casing. Scope: The “basic scope of supply” for the IP1 steam turbine major overhaul will include the following main activ-ities: • Cutting of the inlet steam pipe during disassembly and welding during assembly • Disassembly/opening of the steam turbine • Cleaning, blasting, NDT, fact finding, blue checks, measurements (before/after), etc. • Inspection and overhaul of 1 or more bearing(s) • Repairs of findings • Assembly and adjustments • Commissioning, tests and on-site balancing if needed
Julkaistu
23.02.2026
Myönnetty
23.02.2026
Vagtydelser til Fjernvarme Fyn
Suljettu·Jun 4
Isolation Transformer HAV32
Myönnetty·Jan 27
Levering af biokedelsand
Myönnetty·Oct 29
Levering af biokedelsand
Suljettu·Aug 12
HAV 34/35 150kV kabel, muffer og andet tilbehør
Myönnetty·Jun 5
Tender for a complete 3-winding transformer 165/10.5/10.5kV with rated power of 100/50/50MVA
Myönnetty·Sep 26
Skadeservice 2026
Myönnetty·Nov 2
Brøndsugning
Avoinna tarjouksille·Nov 2
Udbud af medarbejderordning til Region Nordjylland
Avoinna tarjouksille·Nov 2
Udbud af visiteret kørsel
Avoinna tarjouksille·Nov 2
Udbud af rammeaftale om landinspektørydelser
Avoinna tarjouksille·Nov 2
Høring af udbud på stomiprodukter
Suunnittelu·Nov 2
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.