The supplier will be responsible for the manufacture, fabrication and supply of the precast roof panels for Euston Scissor Box, the supplier will also be required to carry out the stage 5 design including fabrication and shop drawings. The supplier will also be responsible for the temporary works scheme.
Julkaistu
11.06.2026
Avoinna tarjouksille
11.06.2026
Ehdot päivitetty
11.06.2026
Määräaika
25.06.2026
M6 Lune Gorge - Roundthwaite Structure Precast Concrete Units
Suljettu·Sep 9
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
Suljettu·Jun 23
BBV HS2 DELTA - Precast Concrete Culvert (Supply only)
Suljettu·Dec 2
BBV HS2 MWCC North - Reinforced Concrete Trough Covers
Suljettu·Oct 21
Debtor Tracing Services
Myönnetty·Oct 28
QOC971 2026-10-28 (0900) Lowestoft - Bure Park Specialist Academy, Great Yarmouth (4 seats, Individual Transport) - AWARD
Myönnetty·Oct 28
ASB505 0900 2026-10-28 Bury St Edmunds-The Junction, Stowmarket (4-seater vehicle) required. - AWARD
Myönnetty·Oct 28
CSP26893 - Administrator
Myönnetty·Oct 28
Portering Task Management System
Myönnetty·Oct 28
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Myönnetty·Oct 28
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.