This project aims to fill key knowledge gaps about the physiology, growth, and viability of the rhizomes of Manchurian wild rice (Zizania latifolia, MWR) in New Zealand (NZ) in order to increase efficacy of treatment and shorten the timeframe required to eliminate infestations of this harmful weed. This will involve the collection of rhizome material from sites in NZ, growth, examination, and manipulation of the material in a laboratory, and testing biosecure disposal methods. From this, we are looking to understand what it is that makes MWR rhizomes so tolerant to herbicide treatment, what factors determine how well herbicides translocate to the rhizomes, how long we have to monitor sites for regrowth and how we can safely dispose of excavated rhizome material.
Julkaistu
15.09.2026
Avoinna tarjouksille
15.09.2026
Määräaika
20.10.2026
407567 Future Proofing Nematology
Avoinna tarjouksille·Oct 15
RFQ for Identity, Integration, and Database Management as a Service (DBMAAS)
Avoinna tarjouksille·Oct 9
Interim Organisational Design, Modelling and Workforce Visualisation Platform
Avoinna tarjouksille·Oct 5
Quantifying Risk and Treatment Needs for Corbicula Vectors
Avoinna tarjouksille·Oct 2
2026 Innovation Investment Round - Round 2
Avoinna tarjouksille·Oct 1
O - C0039170 Poultry Biosecurity Grant
Avoinna tarjouksille·Oct 1
15153 - Queenstown Offline Public Transport Scoping Study (RFT)
Avoinna tarjouksille·Oct 21
407567 Future Proofing Nematology
Avoinna tarjouksille·Oct 15
Quantifying Risk and Treatment Needs for Corbicula Vectors
Avoinna tarjouksille·Oct 2
TRC - North Taranaki Flood Forecasting Tools - September 2026
Suljettu·Sep 10
Youth Health Wellbeing Survey 2028 - MSD
Suljettu·Aug 21
eRNA Validation for Environmental Screening for Avian Influenza Viruses
Suljettu·Jul 30
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.