In December 2025 investigatory works were undertaken to establish the condition of the reinforced concrete, concentrating mainly around half-joints and movement joints in the bridge deck. The results of these investigations have been incorporated in a set of construction drawings and a repair specification. This information will form the basis of a Stage 2 contract to implement repairs and replacement of movement joints.
Määräaika
01.06.2026
Julkaistu
14.10.2026
Myönnetty
14.10.2026
D-TRO Project 2026 Support Services
Myönnetty·Oct 28
CareCubed Social Care Costing Software
Myönnetty·Oct 27
Heron Hill - Window & Door Replacement
Myönnetty·Oct 20
Legal Services Contract for the Heart of Barrow
Myönnetty·Oct 20
CWF Lot 2A - Moss Side Cattle Grid Replacement
Myönnetty·Oct 9
CWF Lot 2A - Town End (Orton) Bridge
Myönnetty·Oct 6
Nether Bridge Parapet Repairs
Myönnetty·Oct 6
Keswick to Threlkeld Bridge Deck Replacement Design and Installation
Myönnetty·Aug 3
Debtor Tracing Services
Myönnetty·Oct 28
QOC971 2026-10-28 (0900) Lowestoft - Bure Park Specialist Academy, Great Yarmouth (4 seats, Individual Transport) - AWARD
Myönnetty·Oct 28
ASB505 0900 2026-10-28 Bury St Edmunds-The Junction, Stowmarket (4-seater vehicle) required. - AWARD
Myönnetty·Oct 28
CSP26893 - Administrator
Myönnetty·Oct 28
Portering Task Management System
Myönnetty·Oct 28
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Myönnetty·Oct 28
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.