Gedling Borough Council appointed Alliance Leisure Services Ltd through the UK Leisure Framework to deliver the Carlton Active project. As part of the approved Leisure Transformation Programme, a two-phase enabling works package was commissioned to facilitate redevelopment of the Richard Herrod Centre site. The Phase 2 Demolition contract incorporates the demolition of the Richard Herrod Centre and associated site preparation works required to create a development-ready site for the future Carlton Active facility. Delivery of Phase 2 Enabling Works comprising: • Demolition of the Richard Herrod Centre. • Removal of associated slabs and foundations. • Site clearance and preparation works. • Demolition of existing bowls club structures. • Temporary site infrastructure and security arrangements. • Utility disconnections and enabling infrastructure works. • Associated project management and delivery services through the UK Leisure Framework.
Julkaistu
21.09.2026
Myönnetty
21.09.2026
Contract for the provision of media and digital communication platform
Myönnetty·Aug 28
Refuse collection vehicles up to 44t
Myönnetty·Aug 28
Carlton Active: Phase 1 Pre-Commencement Works
Myönnetty·Aug 19
Cloud Legal Case Management and Time Recording software and associated services
Myönnetty·Jul 30
Electoral Services Printing and Online Associated Services
Myönnetty·Jul 13
Pre-construction design services Front Street Arnold
Myönnetty·Jul 9
Supply Chain Notice: WC1948344 - CIDP26 Islandwide Demolitions, Dhekelia & Episkopi (CYPRUS)
Suljettu·Oct 20
CA17935 - The Mercian Trust QMHS Cottage Demolition
Myönnetty·Oct 15
Sir Francis Way Demolition
Myönnetty·Aug 24
Supply Chain Notice: WC1857725 - CY- CIDP26 - Tool Ref: 126596-(AK) Akrotiri Mole Steel Jetty - Entire Structure - Refurbish, CYPRUS
Suljettu·Jul 24
Supply Chain Notice: Demolition and associated works
Suljettu·Jul 22
CA17725 - Chesterfield College - ITT for Demolition of North One Block
Myönnetty·Jul 13
Accountancy Apprenticeships
Myönnetty·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Myönnetty·Oct 29
Transition and Exit Technical Support Service
Myönnetty·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Myönnetty·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Avoinna tarjouksille·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Myönnetty·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.