Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. Devegetation Scope of Work: - remove the existing vegetation from the proposed footprint of construction work, including removal of invasive species - JKW.
Julkaistu
07.10.2025
Avoinna tarjouksille
07.10.2025
Määräaika
13.10.2025
Oldfield Road - E & P Works
Suljettu·Oct 22
Oldfield Road - Telecoms
Suljettu·Oct 22
Brewery Turnback - ES6-8 E & P Works
Suljettu·Oct 7
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Suljettu·Oct 7
Brewery Turnback - ES6-8 OLE Infrastructure
Suljettu·Oct 7
Brewery Turnback - ES6-8 Permanent Way
Suljettu·Oct 7
Lower Thames Crossing - Kent Roads - Vegetation Clearance
Suljettu·Apr 2
Lower Thames Crossing - Kent Roads - Vegetation Clearance
Suljettu·Apr 2
Responsive Repairs and Void Property Services - FW0132
Myönnetty·Dec 18
Debtor Tracing Services
Myönnetty·Oct 28
QOC971 2026-10-28 (0900) Lowestoft - Bure Park Specialist Academy, Great Yarmouth (4 seats, Individual Transport) - AWARD
Myönnetty·Oct 28
ASB505 0900 2026-10-28 Bury St Edmunds-The Junction, Stowmarket (4-seater vehicle) required. - AWARD
Myönnetty·Oct 28
CSP26893 - Administrator
Myönnetty·Oct 28
Portering Task Management System
Myönnetty·Oct 28
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Myönnetty·Oct 28
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.