Specialist engineering consultancy services for critical path tasks on the Bray to Greystones Cliff Walk,
Julkaistu
30.10.2026
Myönnetty
30.10.2026
Provision of Painting for Office Reorganisation
Myönnetty·Oct 28
Upgrade Works to Wicklow Town Swimming Facility
Avoinna tarjouksille·Oct 28
PPM of BMS in County Building with Graphics and Software Support
Myönnetty·Oct 22
Single-Party Framework Agreement for Design and Build Refurbishment and Fit-Out Works at Blessington Library and Arts and Cultural Space
Avoinna tarjouksille·Oct 22
Provide E/R Consultancy Services for Hawkstown Phase 2
Myönnetty·Oct 21
Provide M/E Consultancy Services for Barndarrig Housing Development
Myönnetty·Oct 21
SCC2026-0182 Design Services at Lough Lumman, Co Sligo
Myönnetty·Oct 30
Consultancy Services for Main Pier Repair Works at An Daingean Fishery Harbour Centre, Dingle, Co. Kerry, Ireland
Myönnetty·Oct 29
NORA Additional Loading Rack and Dual Purpose Kerosene Storage Tank
Avoinna tarjouksille·Oct 22
N61 Tulsk to Clashaganny Road Project - Technical Consultancy Service
Myönnetty·Oct 22
SCC2026-0148 Design Services at Riverstown Co Sligo
Myönnetty·Oct 19
MiniComp for Civil Structural services Drawn from a Existing Zone B enabling Framework for Renovation/Refurbishment and fit-out of a light industrial unit for the decant of non-acute from UHG
Avoinna tarjouksille·Oct 16
New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
Avoinna tarjouksille·Oct 30
2026/026 Establishment of a Single-Party Framework Agreement for the provision of the Design and Delivery of the “GROW360 PROGRAMME”
Avoinna tarjouksille·Oct 30
Provision of Downhole Geophysical Logging Services
Avoinna tarjouksille·Oct 30
OPW Tender for Cash Collection, Cash Processing and Cash in Transit Services
Avoinna tarjouksille·Oct 30
Call for Tender for the Supply, Delivery and Commissioning Of VR Welding Simulators and Compatible VR Headsets for Donegal ETB
Avoinna tarjouksille·Oct 30
Design and build Dublin Air Traffic Control Centre (ATCC) contingency room
Avoinna tarjouksille·Oct 30
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.