CPI is a leading independent technology innovation centre and a founding member of the UK Government's High Value Manufacturing Catapult, which supports businesses and academia to help them overcome innovation challenges in the development of next generation products and processes by providing the facilities, in depth technical expertise and innovation support to enable ideas, research and knowledge to be translated into commercial business propositions. CPI Neville Hamlin Building (NHB) is located at NetPark. NHB houses a range of offices, laboratories, warehouses/storerooms, and a class 100 and class 1000 clean room. The original building is circa 15 years old, with the cleanroom being extended circa 8 years ago. The original building was constructed with a BMS (building management system) to monitor and, where appropriate, control the building services such as lighting and power distribution, domestic hot water production and distribution and Heating, Ventilation and Air Conditioning (HVAC) systems such that temperature, relative humidity and air pressure can be controlled throughout the facility. The existing BMS is reaching end-of-life and requires replacing. In addition, CPI are seeking to update the technology to the latest version such that it can assist CPI in managing building utility usage as part of CPI's journey to decarbonise its facilities. Thus, the new BMS should incorporate an Environmental Monitoring System (EMS). The new BMS/EMS should be set up with at least 2 levels of user access: "view only" and "full administrative rights" (more than two levels is acceptable). Additional information: The documents are available on Public Contracts Scotland and any correspondence should be made through this portal.
Määräaika
27.02.2023
Julkaistu
10.08.2026
Myönnetty
10.08.2026
Portable Appliance Testing
Myönnetty·Aug 19
Electrical Infrastructure Upgrades and Other Works - Grays Police Station
Myönnetty·Aug 18
Festive Lights Installation and Maintenance
Suljettu·Aug 14
Institutional Capacity Enhancement for International Sustainability Standards Board (ISSB) Adoption in Thailand.
Suljettu·Jun 29
Enabling offshore wind port development and investment
Suljettu·Jun 10
ASEAN Low-Carbon Urban Transport Action Plan Phase I
Myönnetty·Jun 1
Debtor Tracing Services
Myönnetty·Oct 28
QOC971 2026-10-28 (0900) Lowestoft - Bure Park Specialist Academy, Great Yarmouth (4 seats, Individual Transport) - AWARD
Myönnetty·Oct 28
ASB505 0900 2026-10-28 Bury St Edmunds-The Junction, Stowmarket (4-seater vehicle) required. - AWARD
Myönnetty·Oct 28
CSP26893 - Administrator
Myönnetty·Oct 28
Portering Task Management System
Myönnetty·Oct 28
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Myönnetty·Oct 28
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.