We wish to engage a construction supplier to carry out works at the Bethells Valley Fire Station to address inadequate functional capacity, insufficient amenities, and inefficient operational workflow for health and safety, decontamination, and accessibility. The fire station will remain operational for the duration of the project works. The successful supplier will liaise with our Project Manager and brigade leadership team to ensure a mutually agreeable project plan is formulated and maintained, enabling the project to flow seamlessly while minimising the disturbance to brigade operations. Based on the scope of this project this could be achieved by the fire appliances being parked outside each day and brought back in. A site visit is scheduled for 11am 2/9/26 to register for the site visit, contact kelly.gould@fireandemergency.nz Please register your intent to respond by 11/09/26.
Julkaistu
20.08.2026
Avoinna tarjouksille
20.08.2026
Määräaika
20.09.2026
Roslyn Fire Station Layout Improvements
Avoinna tarjouksille·Oct 28
National Medical Officer Services
Avoinna tarjouksille·Oct 21
4201 - Type 1 Appliances (2WD and 4WD Variants)
Avoinna tarjouksille·Oct 8
Fleet Maintenance and Repair - Central Lakes
Suljettu·Sep 20
Fairlie Fire Station Essential Amenities Improvements
Suljettu·Sep 7
4201 - Type 1 Appliances (2WD and 4WD Variants)
Suljettu·Sep 4
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Bayswater School - Main Contractor for 1, 2, 3, 5, 100636, site: Full Roof Replacements, fixings, and Clearlite roofing.
Avoinna tarjouksille·Oct 29
Fire Alarm Upgrade - Amuri Area School
Avoinna tarjouksille·Oct 29
Fire Alarm Upgrade - Ashley Rakahuri School
Avoinna tarjouksille·Oct 29
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.