Our site team are looking for aluminium box drains for the Deck Subsurface Drainage works. - 20 x 40 mm Main section for about 10,000 Linear Metre - 1200Nos. 20 x 40 Junctions - 1Nos. Standard Angle and T Section for 20 x 40 Additional information: Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of work, prior to completing this expression of interest (EOI).
Julkaistu
05.01.2026
Avoinna tarjouksille
05.01.2026
Määräaika
12.01.2026
BBV HS2 MWCC North - Pumped Drainage
Suljettu·Oct 21
BBV HS2 MWCC North - Precast Concrete Attenuation Tank - Design, Manufacture and Deliver
Suljettu·Sep 22
BBV HS2 MWCC North - Architectural Construction Works - Buildings
Suljettu·Jun 23
BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts
Suljettu·May 13
BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts
Suljettu·May 13
BBV Sublot 4 - HSST1020 - Deck realignment and jacking operation
Suljettu·Mar 24
BBV HS2 MWCC North - Precast Concrete Attenuation Tank - Design, Manufacture and Deliver
Suljettu·Sep 22
Floor Gullies and Channels - ANTHRO-PROC-PH4D
Suljettu·Jun 18
1100.03 V-Channel/Slipform
Suljettu·Jun 16
Meadows Renewal Project
Myönnetty·Jan 15
Meadows Renewal Project
Myönnetty·Jan 15
BBV Delta Junction - HSST1040 Deck Subsurface Drainage
Suljettu·Jan 5
Debtor Tracing Services
Myönnetty·Oct 28
QOC971 2026-10-28 (0900) Lowestoft - Bure Park Specialist Academy, Great Yarmouth (4 seats, Individual Transport) - AWARD
Myönnetty·Oct 28
ASB505 0900 2026-10-28 Bury St Edmunds-The Junction, Stowmarket (4-seater vehicle) required. - AWARD
Myönnetty·Oct 28
CSP26893 - Administrator
Myönnetty·Oct 28
Portering Task Management System
Myönnetty·Oct 28
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Myönnetty·Oct 28
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.