The Mining Remediation Authority (MRA) is seeking a contractor to provide battery energy storage solutions for two of our Mine Water Treatment Schemes (MWTS) where solar PV systems are already installed. For each site, the costs for the following items was requested: • Battery Energy Storage System(s) (BESS) • Battery Energy Management System (BEMS) • Replacement of existing solar PV inverters where required to ensure compatibility with the retrofitted BESS. Additional information: We have completed a compliant procurement by mini competition through the Crown Commercial Services Demand Management and Renewal Framework (RM6314). CCS DMR Framework - Lot 2.1 - Procurement of Battery Energy Storage CCS DMR Framework Ref: DMR-45213-2025
Määräaika
26.01.2026
Julkaistu
18.03.2026
Myönnetty
18.03.2026
WAN + Server Switch Replacement & Associated Services
Myönnetty·Oct 9
IT Hardware Call Off
Myönnetty·Aug 7
Board Management Tool Software
Myönnetty·Jun 29
Nent Haggs Compound Reinstatement
Myönnetty·Jun 3
NEC4 ECC Project Manager, ECC Supervisor, Commercial Manager & Environmental Clerk of Works (ECoW) for the Dylife project
Myönnetty·Jun 1
Employee Safety App & Devices
Myönnetty·Apr 28
Procurement of Solar Power Systems
Suljettu·Sep 30
Vale House Solar
Myönnetty·Sep 14
Supply and/or Install of Rooftop Solar Photovoltaic Systems and Associated Equipment Y24013
Suljettu·Jun 26
Solar PV Panels for Various Sites - Installation
Myönnetty·Mar 17
Solar PV Panels for Various Sites - Installation
Myönnetty·Mar 17
Supply and/or Install of Rooftop Solar Photovoltaic Systems and Associated Equipment Y24013
Myönnetty·Mar 17
Accountancy Apprenticeships
Myönnetty·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Myönnetty·Oct 29
Transition and Exit Technical Support Service
Myönnetty·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Myönnetty·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Avoinna tarjouksille·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Myönnetty·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.