Development, production and delivery of specialised electronic software and few hardware for the control, data acquisition and monitoring of the accelerators. All these components need full software integration into the FAIR accelerator control system. Further, the services include upgrade of already existing operational systems. The services are expected to be delivered within a period of 24 months. For the construction of the first facility section of FAIR, special hardware and electronic components are required on the one hand, as well as support services for software integration into the accelerator's control system and beam diagnostic system. The hardware and software integration serves to ensure compatibility with the very complex and specific control system standards of the FAIR accelerator and is a main component of the scope of delivery. This includes the extension or development of so-called FESA classes with integrated LSA data supply by the accelerator control system as well as the connection to the campus-wide timing system based on a white-rabbit real-time network. In this context, special electronic and mechanical components are to be supplied, as well as programming and support services
Julkaistu
14.07.2026
Myönnetty
14.07.2026
Mettler XPR2U microbalance
Avoinna tarjouksille·Oct 29
Supervision Frankreich
Myönnetty·Oct 29
Rahmenvertrag für Montage- und Transportdienstleistungen zur Installation von SFRS-Komponenten
Avoinna tarjouksille·Oct 27
Compressed Air Components for FAIR
Avoinna tarjouksille·Oct 25
LITE TLD Reader
Myönnetty·Oct 14
Hand-Foot-Clothing-Monitors FAIR BSA
Avoinna tarjouksille·Oct 8
SCADA Hard- and Software Ukraine
Avoinna tarjouksille·Oct 17
Neuerrichtung eines klimaneutralen Verwaltungsgebäudes; Gebäudeautomation
Myönnetty·Sep 29
Rahmenvereinbarung Lieferung und Montage Medientechnik
Suljettu·Aug 26
Sleepertrasse
Myönnetty·Aug 18
Bundesstadt Bonn: La Redoute - Erneuerung der MSR nach Angebot. Aufgrund der Kompatibilität kann die Durchführung der Arbeit nur durch den Hersteller erfolgen.
Myönnetty·Jul 19
Sleepertrasse
Peruutettu·Jul 1
Neue Waldorfschule Dresden, Neubau BA 3 Oberstufenhaus - Los 43 - Stark- und Schwachstrom
Avoinna tarjouksille·Oct 29
Monitoring Lausitzer Neiße - Polnische Seite
Myönnetty·Oct 29
Kauf fabrikneuer Beladung für Feuerwehrfahrzeuge
Avoinna tarjouksille·Oct 29
Rahmenvereinbarung über die Lieferung von KFZ-Ersatzteilen und Verbrauchsmaterial (Kopie)
Avoinna tarjouksille·Oct 29
1885-NA-D-LBO Planning Client
Myönnetty·Oct 29
Hanau, Am Hauptbahnhof 1, Sanitär- und Heizungsarbeiten
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.