This project will replace the ageing automatic entry doors serving the main entrances to A Block and B Block together with the replacement of the existing passenger lift located in B Block. A and B Block Entrance doors: • Remove existing automatic entry doors. • Install new automatic sliding door system. • Remove existing Georgian wired glass screens. • Replace existing canopy roofing and cladding. • Remove asbestos cladding within project area. • Install new exterior cladding. • Install new internal and external timber screening. • Install new recessed entrance matting. • Reinstate existing access control system. B Block Passenger Lift: • Removal of existing lift equipment. • Installation of new lift. • New lift controls. • Modern accessibility features. • Improved reliability. • Compliance with current accessibility standards. Retentions are applicable. Contract works insurance to be arranged by WITT.
Julkaistu
13.09.2026
Avoinna tarjouksille
13.09.2026
Määräaika
15.10.2026
K Block Extract System Upgrade
Avoinna tarjouksille·Oct 14
A-block Level 3 Science Lab Fitout
Suljettu·Sep 13
UNITEC Facilitation of Wananga on Stakeholder Aspirations in Vocational Education and Training
Myönnetty·Dec 19
RFP Engineering Services
Myönnetty·Dec 19
ARA L Block Seismic Strengthening Project
Myönnetty·Dec 19
RFP Unitec Building 114 HVAC Upgrade
Myönnetty·Dec 19
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Avoinna tarjouksille·Oct 23
Main Building Contractor for H O Student Toilets Refurbisment at Tahatai Coast School
Avoinna tarjouksille·Oct 18
Main Building Contractor for Blk A B Toilets Heating Electrical Upgrades & Classroom Remediation at Taradale High School
Avoinna tarjouksille·Oct 15
Ngā Taupuni restroom refurbishment
Suljettu·Sep 30
A-block Level 3 Science Lab Fitout
Suljettu·Sep 13
Main Contractor for Project 262660 A B C N F K S T U V Roofing Drainage Electrical Cladding Plumbing at Edgecumbe Primary School
Suljettu·Aug 27
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.