The works are to include, strip the existing waterproofing system in all its parts, including insulation, back to the underlying Cross Laminated Timber deck. Inspect the existing deck for degradation and repair/ replace as necessary. Supply and install a new High-Performance Elastomeric TA-30 warm roof RBM system, incorporating a Parafoam Ultra Tapered Board Insulation scheme, achieving the maximum required U-value of 0.18 W/m²K. All works to include the temporary removal and reinstatement of all mechanical & electrical services.
Fecha límite
12.02.2026
Publicado
04.08.2026
Adjudicado
04.08.2026
Planned Roofing Works 27 West
Provisions of External Decoration, Painting and Repair services
GB-Colchester: 0481-PA - Small Flat Roofs (Flats & Maisonettes - Contract G) *Duplicated*
GB-Colchester: Flat Roofing works (small roofs - Houses)
Swarcliffe 2026
Planned Roofing Works 27 North
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Todos los derechos reservados.