The DfT envisages inviting submissions for a competitive tender process for advisory, feasibility and detailed design services. This work follows the completion of feasibility studies examining site options for a potential new rail maintenance depot and stabling on the HS1 route for international high-speed rail passenger services. Two leading site options have been identified for further work, including the potential for a mixed-use international and domestic site, on which detailed technical feasibility and design work is required.
Fecha límite
05.08.2026
Publicado
27.08.2026
Adjudicado
27.08.2026
THRE0085 - Aviation Values of Travel Time Framework
P4104088A Legal Advisers for the Euston Programme Lot 1
P4105013 Provision of Legal Advisers for Project Tara
RSGR0003 - National Rail Travel Survey - Discovery Phase
THRE0086 - Active travel values of travel time methodology
P4104119A Legal Advisers for the DfTLA
Lot 4B- Rail Station Accessibility Study
Rotherham Mainline Station Transportation Consultancy
Transport Pipeline Support
INTERFACE MANAGER
Bus Transport Consultancy
THRE0059 Rail Safety Advisor
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Todos los derechos reservados.