Timaru District Council (TDC) is seeking a contractor to construct a new bridge over Otipua Creek between Landsborough Road and Coonoor Road. The existing masonry arch bridge is in poor condition with limited remaining life for vehicle traffic, and ongoing maintenance is constrained by its age and heritage status. The current road alignment and intersection geometry also present safety concerns, including restricted visibility and a history of crashes at the site. To address these issues, Council intends to construct a new 22.5m long, two-lane bridge on an improved alignment, alongside associated road and intersection upgrades, while retaining the existing bridge for pedestrian and cycling use.
Publicado
14.08.2026
Abierto para ofertas
14.08.2026
Fecha límite
18.09.2026
RFP2828 - Timaru CBD Tile Replacement Programme Investment and Delivery Plan
RFP 2794 - Temuka Raw Water Trunk Network Upgrade – Design and Build
2813 - Stafford Street and Barnard Street Water Services Renewal
RFT2797 - Kellands Hill/Rosewill Valley/Cartwrights Roads “SH1 Resilience Route” Project
RFP2702 - Talbot Street Sewer Main Upgrade
RFP2828 - Timaru CBD Tile Replacement Programme Investment and Delivery Plan
RFT2797 - Kellands Hill/Rosewill Valley/Cartwrights Roads “SH1 Resilience Route” Project
RFP - Northland Trades Services Panel for Locksmith Projects and Maintenance Services
Vehicle Signage
RFT - Main Contractor for Gym Alterations at Murchison Area School, Murchison, Tasman
Main Contractor for Block A Hall High Level Roof Replacement at James Hargest College
Taihape Raw Water Falling Main Replacement Stage 6 Pt A – Railway
Main Contractor for 4: Toilet Refurbishment at Bayview School
© 2026 SIA «Vietne». Todos los derechos reservados.