Pipe Jacking

Buyer: SKANSKA CONSTRUCTION UK LIMITED (UK)

Budget: GBP 1

Published: 1/29/2026

Category: Jacks and vehicle hoists

Description

The scope consists of the installation of the connection pipe from the A1 underpass through to the pumping station shaft, forming the drainage outlet from the Black Cat underpass into the pumping station IF INTERESTED - please complete the form found under 'LINKS'

Source: official portal