A new DFU network infrastructure to replace current one. The hardware, is end of life and needs replacement, includes second site, Leeds with a limited DF capability suitable to support DR requirements for the London location.
Fecha límite
08.05.2026
Publicado
23.07.2026
Adjudicado
23.07.2026
© 2026 SIA «Vietne». Todos los derechos reservados.