The design, manufacture, supply, installation and commissioning of - SGS Phase 5 Control Panel Replacement 2026/27 3 No. MCC dual pump Control Panels and 3 No. Single pump control panels including associated works. Partial decommissioning of MCC on one redundant borehole site. (At the Client's sole discretion, SGS Phase 1 Control Panel Replacement 2027/28 and SGS Phase 2 Control Panel Replacement 2028/29 below may be instructed via Compensation Event) SGS Phase 1 Control Panel Replacement 2027/28 2 No. MCC dual pump Control Panels and 5 No. Single pump control panels including associated works. Partial decommissioning of MCC on one redundant borehole site. SGS Phase 2 Control Panel Replacement 2028/29 1 No. MCC dual pump Control Panels and 8 No. Single pump control panels including associated works.
Fecha límite
13.04.2026
Publicado
26.06.2026
Adjudicado
26.06.2026
CDF - Mids - Helpston Remediation ECC
Blaydon Quarry Landfill Gas Monitoring
Mids - AOMR - Lot 1 - Derbyshire Desilts
WMD - Lower Risk Debris Screens - Site Supervisor - CPS Lot 1
SE - SCAPE - 46 Nine Elms Lane Pre-Construction Activities
SE - CPS Lot 1 - 46 Nine Elms Stakeholder Engagement Officer
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Todos los derechos reservados.