The University is delivering the Mary Seacole Building decarbonisation project using funding secured through the Public Sector Decarbonisation Scheme (PSDS). The scheme proposes to undertake a targeted decarbonisation programme and comprises: • Full design, supply and installation of a roof-mounted photovoltaic (PV) array, including associated electrical works, inverters, metering, modifications to existing electrical network and lightning protection adjustments. • Full design, supply and installation of building wide LED lighting replacement, covering approximately 2,200 internal luminaires and 48 external fittings, alongside upgrades to lighting controls, emergency lighting and associated making good of building fabric.
Fecha límite
23.04.2026
Publicado
09.06.2026
Adjudicado
09.06.2026
PAHT - Resus area ductwork and fire/smoke damper
Cost Management Services for Ottawa Residence Refurbishment Project
PRP319 Solomon House - Refurb works
ENHT - Theatre 5 and 6 Renovation Works
SUPPLY CHAIN NOTICE_WC1802680 & WC1582259 - (EP0035) Repair the flat roofs Waterproofing membranes at the north and south elevations & JRD Upgrades in line with the Defence Catering Strategy, Episkopi, Cyprus
ENHT - Theatre 7 and 8 Renovation Works
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Todos los derechos reservados.