Publicado
09.09.2026
Abierto para ofertas
09.09.2026
Fecha límite
17.09.2026
Floor replacement at 3 main access control areas of the US Embassy in Lima, Peru
Main Entrance and walkway renovation
Lima - Water Treatment System for Cooling Towers
Lima - Preventive Maintenance Cooling Towers 3&4
Lima - Preventive Maintenance Cooling Towers 1&2
Main Entrance and walkway renovation
SEQUENCER,FLASH
Multiple Award Schedule
LIGHT,INDICATOR
KIT,RETRO LANTERN
FIXTURE,LIGHTING
Generac MLT6SMDS Mobile Led Light Towers
C--WOOLPERT GEOSPATIAL PRODUCTS AND SERVICES CONTRACT v4 (GPSC4)
SR Power Supplies Rack Detailed Design for ALS-U
Emergency Response Wraparound Services
Wheat DNA Library Sequencing
Cable Fiber Install ATC Tower Dobbins ARB
J--Flooring Replacement and Baseboard, Bldg 50, BIA,
© 2026 SIA «Vietne». Todos los derechos reservados.