The project involves the removal and replacement of windows located on the first floor of the Jubilee Building. The existing windows are at end of life and require replacement with new windows of equivalent style, dimensions, and opening configuration to maintain the building's external aesthetic, performance, and existing ventilation strategy. All works shall be planned and executed to ensure minimal disruption to clinical and administrative operations within the building.
Fecha límite
22.12.2025
Publicado
10.02.2026
Awarded
10.02.2026
CA17502 - The Mercian Trust Shire Oak Academy Science Block Window Replacement
Lansdowne Green Window Replacement
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Todos los derechos reservados.