The works comprise of two works packages: replacement of the boiler plant and replacement of the mains LV switchboard. The boiler works are to strip out the existing boilers, flues, pipework and redundant oil tank and replace with four new gas boilers complete with new gas and LTHW pipework, a plate heat exchanger, pressurisation units, air and dirt separators flues, and a temporary boiler to maintain heating during the works, along with all associated electrical, controls/BMS, and builders work. The switchboard works are to remove the existing mains LV switchboard, installing a temporary panel board to keep the building powered and subsequently replace with a new mains LV switchboard, re-terminating and partially replacing the existing submains, and testing/commissioning the full installation in coordination with UKPN including surveys and validations
Fecha límite
27.07.2026
Publicado
28.08.2026
Adjudicado
28.08.2026
CPU 8628 Mix It Potholes - Elastomac Works - Provision for delivery of statutory Highway Maintenance
Passenger & Goods Lift RTQ 2027 - AWARD
CWF Lot 1B - Heart of Kendal - Indoor Market Detailed Design and Construction
ASDA Roundabout Improvements
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
CPU 8629 Footway - City Centre Streetscape Resource re Masonry Works
© 2026 SIA «Vietne». Todos los derechos reservados.