•During stage 4 Ingleton Wood LLP will attend 2 no. design coordination meetings and will receive a full package of information for review and comment, providing comment (status a,b,c etc) and includes a follow up review. •During stage 5 Ingleton Wood LLP will attend site 15no. times, note Structural and Civil have allowed for 6no. visits only. •During stage 6 we have allowed to attend site twice for carrying out defects and post completion inspections and receiving a full package of O&M information and as-builts , so that one full check is carried out.
Fecha límite
10.05.2026
Publicado
11.05.2026
Awarded
11.05.2026
GB-Colchester: 0475-PA Enforcement Agents
GB-Colchester: 0485 - PA Colbea House External Repair & Redecorations
GB-Colchester: 0471 - PA Compartmentation and Internal Storage Fire Doors
GB-Colchester: 0457 - PA - Monkwick Open Space Refurbishments
GB-Colchester: 0445 - Clear Plastic Refuse Sacks - Annual Order 2026
Architectural and Design Services for a new Multi-Purpose Community Hall, Elsenham
SNTH Architectural and engineering design services
Gentoo - Old Mill Road Engineer
ENQ1305 - Derby City Council Highways Maintenance Framework Support (Technical)
DSP1 1376 - Winter pollarding 2026 ROUTE 3
DPS1 1372 - Winter Pollard 2026
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Todos los derechos reservados.