Following an independent survey and fire risk assessment completed in 2023 by Marpal Fire Safety, DCG is seeking to procure the services of a single contractor to undertake a fire door set upgrade, replacement, refurbishment, repair (to include disposal of old fire doors) at Joseph Wright ASAP and no later than 20.03.26 with the potential to include all campuses over a longer term. Please see the tender guidance for further details.
Fecha límite
09.12.2025
Publicado
12.01.2026
Awarded
12.01.2026
Passive Fire Remedial Works
PL0362 Greenhill Lodge - Fire Compliance and Refurbishment Works - Design & Build Contract
Building Safety Assessments
Sureserve Fire Remedials 1 year
Active Fire Electronic Security
Fire Remediation Works with Aster Group
© 2026 SIA «Vietne». Todos los derechos reservados.