Feasibility Studies: The feasibility studies defined here represent the first phase of the Falcon Successor project. DLR's objective is to initiate the subsequent phases of the Falcon Successor project following the conclusion of the preliminary studies based on results received. The next phases, which are not part of the feasibility study tender, are the aircraft acquisition and aircraft modification. These phases include commissioning of the aircraft acquisition and development of the platform via a separate tender, with the goal of delivering the Falcon Successor platform to DLR by the end of 2029.
Publicado
29.05.2026
Adjudicado
29.05.2026
Bildungscampus, Machbarkeitsstudie
Cerrado·Oct 9
Hydrogen Import Terminal (HITW) Terminal-FEED Study
Cerrado·Sep 3
Konzeptstudie „Errichtung von Infrastruktur für den Einsatz von BEMU im Vergabenetz SUN“
Cancelado·Aug 13
Hydrologisches Gutachten und hydraulische Modellierung des Poldersystems Neuensiener See
Cerrado·Aug 9
Bildungscampus, Machbarkeitsstudie
Cerrado·May 31
Konzeptstudie eines Prüfstandes für induktive Ladesysteme von Elektrofahrzeugen
Cerrado·Apr 1
Einrichtung BE-Flächen und Wege und Aufbau und Betrieb Baubüros auf der Strecke 3825 km 0-46
Abierto para ofertas·Oct 21
Planungsleistungen zur Verbesserung der Energieeffizienz des beruflichen Schulzentrums Riesa mit Teilsanierung Sporthalle
Abierto para ofertas·Oct 21
Kindergartenzweckverband Bogel - Neubau Kita Bogel: Los 1 - Fachplanungsleistungen Technische Ausrüstung HLS
Abierto para ofertas·Oct 21
CCLXXXIV-9-2024-BM-Große Langgasse und Steingasse-Trockenbauarbeiten Trockenbauarbeiten in 55116 Mainz
Abierto para ofertas·Oct 21
Schülerbeförderung
Abierto para ofertas·Oct 21
Kauf von Nutzfahrzeugen
Abierto para ofertas·Oct 21
Cree una cuenta para estudiar esta licitación y encontrar oportunidades similares.