Publicado
18.09.2026
Abierto para ofertas
18.09.2026
Fecha límite
25.09.2026
IDIQ Boundary Maintenance Beaver Lake Project
IDIQ General Maintenance Services, Beaver Project Office
22 Area Medical-Dental Clinic Replacement - Camp Pendleton, CA
Pool 2 Park Cleaning Services Pine Bluff Project Office/Arkansas Post Field Office
Excitation System Replacement, Table Rock Dam, White River Basin, Taney County Missouri
Hazardous Tree Services and Boundary Maintenance
CONTROL,GENERATOR, IN REPAIR/MODIFICATION OF
MOTOR,DIRECT CURREN
MOTOR,DIRECT CURRENT
Brushless DC motor for UAS
Standby Generator
Standby Generator
Locker Room Renovation at UMSB
Procure one (1) each 463L Cargo Electronic Pallet Scale model UBELS0709-10K
MODULATOR,PWR SUP, IN REPAIR/MODIFICATION OF
METC Microwave and Refrigerator Relocation and Storage
CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Cognitive Ecology and Eco-Hydraulics Research Flume Pump Maintenance
© 2026 SIA «Vietne». Todos los derechos reservados.