The Tower Block Dirty Utility Conversion works at Gloucestershire Royal Hospital comprise the conversion of existing dirty utility rooms into bin stores as part of remedial measures to improve fire safety. The scope of works includes isolating and draining down the hot and cold-water services; removing redundant pipework, fittings and waste connections serving the sluice sink; stripping out the existing worktop and wall-mounted fixtures; isolating and removing socket fronts to facilitate the installation of floor-to-ceiling white rock wall cladding with jointing strips; reinstating socket fronts upon completion; providing Chapter 8 barriers to the lift lobby and ward access areas; checking that riser cupboard door locks and slip bolts are operational; and providing a banksman as required.
Fecha límite
14.08.2026
Publicado
08.09.2026
Adjudicado
08.09.2026
NHP - Hospital 2.0 Alliance (H2A) Framework Call-Off Contract FHFT
BE049 Parkhouse Street Design and Build Contract
SIXEP/FHP Main Roof Refurbishment Project
CBC-1970-T-SM A&A Works-Single Story Extension - AWARD
Kitchen & Bathroom Replacements
Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
CONTRACT AWARD NOTICE - FDIS - Wyton Whole House Refurbishments to 25 properties - FY2026/27 - Amey Central Region - East
Digby Whole House Refurbishment of 5 properties - FY2026/27 - Amey Central Region - East Midlands & Nth
CONTRACT AWARD NOTICE - FDIS - Dishforth Whole House Refurbishments to 7 properties - FY2026/27 - Amey North Region - Northern England
CONTRACT AWARD NOTICE - FDIS - Fulford Whole House Refurbishments to 9 properties - FY2026/27 - Amey North Region - Northern England
CONTRACT AWARD NOTICE - FDIS - Wyton Whole House Refurbishments to 7 properties - FY2026/27 - Amey Central Region - East
CONTRACT AWARD NOTICE - FDIS - Topcliffe Whole House Refurbishments to 7 properties - FY2026/27 - Amey North Region - Northern England
© 2026 SIA «Vietne». Todos los derechos reservados.