Construction of 258m3 attenuation basin as per designs Construction of new manhole off Yorkshire Water sewer with weir allowing water into basin as per design Construction of Headwall as per design Removal of Waste material as required.
Fecha límite
02.10.2025
Publicado
19.06.2026
Adjudicado
19.06.2026
© 2026 SIA «Vietne». Todos los derechos reservados.