Replacement of AHUs and BlueBox which have reached the end of their service life. This requirement was awarded through the NHSSBS framework Hard Facilities Management 2 (Hard FM), Lot 5.1: Ventilation and Air Conditioning,
Fecha límite
16.10.2025
Publicado
11.08.2026
Adjudicado
11.08.2026
© 2026 SIA «Vietne». Todos los derechos reservados.