Loading Otnox...
Otnox
UKReino Unido·Comprador: BALFOUR BEATTY CIVIL ENGINEERING LIMITED

A66 - Demolition

Cerrado·7 abr 2026·GBP 200,000

The package covers, but is not limited to, the following structural components: A section of online dualling extending between the centre parcs whinfell forest development and the start of the temple sowerby bypass

Fecha límite

06.03.2026

Publicado

07.04.2026

Aktīvs

07.04.2026

© 2026 SIA «Vietne». Todos los derechos reservados.