Publicado
18.09.2026
Abierto para ofertas
18.09.2026
Fecha límite
24.09.2026
FY26-HIG-922 Joanna Briggs Institute Subscription (VA-26-00059034) | Hoffman/Schoenecker | Base POP 9/24/26 - 9/23/26
Proj #TBD | Elevator Modernization | Elias/Prather
Martinsburg, WV Warehouse IOTA
646-24-100 | Elevator Upgrade Bed Tower | Pittsburgh - UD
Burlington, VT and Cheshire County IOT&A
FY26-HIG-922 Joanna Briggs Institute Subscription (VA-26-00059034) | Hoffman/Schoenecker | Base POP 9/24/26 - 9/23/26
Repair RTS Multiple Buildings
MCB Camp Pendleton, CA Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)
PMEL Freezer Farm Renovation Project
Prequalification of Sources for Construction Services to include Design-Build (DB) and Design Bid-Build (DBB) for the U.S. Army Corps of Engineers (USACE) Honolulu District, Area of Responsibility (AOR), Primarily on Kwajalein Atoll, Republic of the Marsh
Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North Carolina
B268 Replace STUS Backup Generator
Locker Room Renovation at UMSB
Procure one (1) each 463L Cargo Electronic Pallet Scale model UBELS0709-10K
MODULATOR,PWR SUP, IN REPAIR/MODIFICATION OF
METC Microwave and Refrigerator Relocation and Storage
CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Cognitive Ecology and Eco-Hydraulics Research Flume Pump Maintenance
© 2026 SIA «Vietne». Todos los derechos reservados.