Publicado
08.09.2026
Abierto para ofertas
08.09.2026
Fecha límite
10.09.2026
Large Penetrator Warhead Case Assembly Production
Large Penetrator Warhead Case Assembly Production
BLU-138/B Fuze System
155mm Artillery Cannister Assembly
Precision Guidance Kit (PGK)
155mm Artillery Cannister Assembly
Locker Room Renovation at UMSB
Procure one (1) each 463L Cargo Electronic Pallet Scale model UBELS0709-10K
MODULATOR,PWR SUP, IN REPAIR/MODIFICATION OF
METC Microwave and Refrigerator Relocation and Storage
CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Cognitive Ecology and Eco-Hydraulics Research Flume Pump Maintenance
© 2026 SIA «Vietne». Todos los derechos reservados.