Masterton District Council (MDC) are inviting suitably qualified contractors to deliver the Kibblewhite Road Kerb and Channel Installation Project. MDC is progressing with the upgrades of essential infrastructure along Kibblewhite Road between the intersection at with Upper Plain Road and Mary Street/Green Lane Road. The project includes installation of new kerb and channel along the north-western side of the road and also includes installation of new stormwater catchpits and pipes.
Publicado
19.07.2026
Abierto para ofertas
19.07.2026
Fecha límite
24.08.2026
Te Maunga Closed Landfill - Immediate Physical Works
Munro Road Resilience Improvements
753-27-004-PWP No.452 Dairy Flat Highway RP4590m Slip Remediation & Associated Works
Seismic Strengthening of McLellan Street Bridge
Main Contractor for Northland D500 Project - Kawakawa and Whangarei
Main Contractor for Northland D500 Project - Kawakawa and Whangarei
RFP - Northland Trades Services Panel for Locksmith Projects and Maintenance Services
Vehicle Signage
RFT - Main Contractor for Gym Alterations at Murchison Area School, Murchison, Tasman
Main Contractor for Block A Hall High Level Roof Replacement at James Hargest College
Taihape Raw Water Falling Main Replacement Stage 6 Pt A – Railway
Main Contractor for 4: Toilet Refurbishment at Bayview School
© 2026 SIA «Vietne». Todos los derechos reservados.