Pipe Jacking
Buyer: SKANSKA CONSTRUCTION UK LIMITED (UK)
Budget: GBP 1
Published: 1/29/2026
Category: Jacks and vehicle hoists
Description
The scope consists of the installation of the connection pipe from the A1 underpass through to the pumping station shaft, forming the drainage outlet from the Black Cat underpass into the pumping station IF INTERESTED - please complete the form found under 'LINKS'