Maintenance Work On Sterte Channel
Buyer: Bournemouth Christchurch and Poole Council (UK)
Budget: GBP 493K
Published: 2/5/2026
Awarded to: Suttle Projects
Category: Construction work for water projects
Description
Maintenance work for Sterte Channel in Poole. Aspects of this work include over pumping the channel to create a drywork environment then cleaning corrosion products from the existing piling and spray coating a protective layer to the SSP surface