Otnox
NZNeuseeland·Auftraggeber: Westland District Council

WCWT New Totara River Bridge RFP

Zuschlag erteilt·27 Nov. 2025

A.1.2 Invitation to Submit Proposal On behalf of the Principal, we are inviting proposals to design and construct the works of the above-named Contract. The Contract Works include design and construction of a new Totara River Suspension Bridge for use by cyclists and pedestrians, and a light maintenance vehicle, and are described in more detail below. Proposals for the Contract must be prepared and submitted in accordance with the conditions of proposals in A.2. A valid proposal requires the submission of the items in the checklist in B.1 signed where indicated by an authorised representative of the proposer.

Frist

17.10.2025

Veröffentlicht

27.11.2025

Zuschlag erteilt

27.11.2025

Otnox

Finden Sie Ausschreibungen, bei denen sich die Teilnahme lohnt.

Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.

  • VergabeunterlagenPrüfen Sie verfügbare Dateien in einem Arbeitsbereich.
  • Anforderungen und RisikenBeauftragen Sie eine Dokumentenanalyse mit Quellenverweisen.
  • Ihre AusschreibungsauswahlFahren Sie mit Ihren gewählten Märkten und Branchen fort.