This contract is for the construction of the Wairoa Airport Runway Extension project. The Contract Works include, but are not limited to: •Construction of the northern runway extension and associated runway pavement works. •Widening of existing runway pavement areas and southern RESA / turn pad related works. •Earthworks, subgrade preparation, pavement construction and surfacing. •Drainage and stormwater improvements, including culvert extension, stormwater pipe installation, cesspits, concrete dish channels, swale construction, localised drainage grading and associated drainage works. •Airfield pavement marking and associated airport civil works. •Protection of the existing beacon lights. •Environmental management, erosion and sediment control, quality assurance testing, as-built records and completion documentation.
Veröffentlicht
16.09.2026
Offen für Angebote
16.09.2026
Frist
07.10.2026
14650 - SH1 Ocean Beach Resilience Project - Implementation - Advance Notice
14363 - SH6 Cromwell to Kingston Resilience - PW
15007 - SH6 Inangahua Slip - PW
13965 - Coal Creek Overbridge - PW
HPMV Bridge Strengthening: Oruru Bridge E36
P2026-741 Wastewater Growth Programme – Waipatu Local Servicing
2026/024 KiwiRail Heavy & Industrial MHE RFP
Main Contractor ROI for B Block Remediation at Epsom Girls Grammar School
Devonport Small Boats Facility
Auckland Botanic Gardens wedding and private event sites concessionaire
WDC-26-151 - Whakatāne Floodwall Integration – Quay St and the Strand demolition work
CON 26-20 Districtwide Footpath, Kerb and Channel Renewals
© 2026 SIA «Vietne». Alle Rechte vorbehalten.