single fluorescent fitting complete, LED Philips or other equal · Double switch socket ABB or other equal approved · Main switch 6way , 1PH with integral RCD 100A/300mmA ABB other equal approved · Circuit breaker 100A/300mmA tronic · single core wire 1.5 sqmm-Red · single core wire 1.5sqmm-Black · single core wire 2.5sqmm-Green · Connecting wires or leads · single core wire 1.5sqmm-Green · Single core wire 2.5sqmm-Red · 3gang 1way switch ABB or other approved · 1gang 1way switch ABB or other approved
Veröffentlicht
19.10.2026
Offen für Angebote
19.10.2026
Frist
22.10.2026
Supply of comprehensive building materials for all construction stages (foundation, structure, finishing and installation)
Geschlossen·Oct 26
Supply of comprehensive building materials for all construction stages (foundation, structure, finishing and installation)
Geschlossen·Oct 20
Supply of comprehensive building materials for all construction stages (foundation, structure, finishing and installation)
Geschlossen·Oct 19
Supply of comprehensive building materials for all construction stages (foundation, structure, finishing and installation)
Geschlossen·Oct 19
Supply of comprehensive building materials for all construction stages (foundation, structure, finishing and installation)
Geschlossen·Oct 19
Provision of labour for general construction services (masonry, carpentry, roofing, electrical, plumbing, interior and exterior finishing)
Geschlossen·Oct 9
Supply of electrical installation materials
Offen für Angebote·Oct 31
Supply of electrical installation materials
Offen für Angebote·Oct 31
Supply of electrical installation materials
Geschlossen·Oct 30
Supply of electrical installation materials
Geschlossen·Oct 28
Supply of electrical installation materials
Zuschlag erteilt·Oct 22
Supply of electrical installation materials
Geschlossen·Oct 19
Supply of cleaning equipment and supplies
Zuschlag erteilt·Nov 2
(untitled)
Zuschlag erteilt·Nov 2
(untitled)
Geschlossen·Nov 2
Supply an Fix of Aluminum windows for Kishoju Dispensary
Zuschlag erteilt·Nov 2
Consultancy Services for Feasibility Study,Environmental and Social Impact Assessment,Detailed Engineering Design,Preparation of Tender Documents for Upgrading of Tingi-Kipatimu- Nandete - Mabiga (Lin
Offen für Angebote·Nov 2
Supply of Construction Materials Under Framework Agreement
Zuschlag erteilt·Nov 2
Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.