This Contract comprises the construction of a new single-lane roundabout at the intersection of Selwyn Road and Springston Rolleston Road, including the provision of shared path connections and associated infrastructure works. The project is intended to improve the safety, efficiency, and accessibility of this key transport corridor while supporting current and future growth within the surrounding communities. The intersection is located at the southern extent of the Rolleston urban area and forms part of an important transport link between the growing townships of Rolleston to the north and Lincoln to the south. Springston Rolleston Road currently operates as the priority route through the intersection and experiences significant commuter traffic volumes. The surrounding land uses present a range of stakeholder and interface considerations, including the Selwyn Road Sewer Pump Station within the south-western quadrant, school land to the north-west, residential properties to the north-east, and rural pastoral land to the south-east. Scope of Works The works include, but are not limited to: • Earthworks and pavement construction associated with the new roundabout and approach roads. • Construction of stormwater infrastructure. • Piping and reinstatement of existing stockwater races. • Liaison and coordination with utility providers, including protection, modification, and installation of services as required. • Construction of carriageways, kerbs and channels. • Construction of shared pathways, cycle facilities, footpaths, and vehicle crossings. • Construction of splitter islands, traffic islands, and associated traffic restraint features. • Installation of road markings and traffic signage. • Landscaping works including garden beds, planting areas, specimen trees, shrubs, grasses, groundcovers, mulching, and tree staking. • Traffic management, erosion and sediment control, noise management, survey set-out, and associated temporary works. • Maintenance of all landscaped and grassed areas for a period of 24 months following Practical Completion. • All ancillary works necessary to deliver a fully completed and operational project in accordance with the contract documentation. • Coordination of street lighting installation by Connetics, including integration of these works within the overall construction programme and management of associated construction interfaces.
Veröffentlicht
15.10.2026
Offen für Angebote
15.10.2026
Frist
12.11.2026
Solar PV and BESS – Community Resilience Programme
Offen für Angebote·Oct 16
Road Maintenance Contract
Offen für Angebote·Oct 14
Goulds Road Improvement – Consultancy Works
Geschlossen·Sep 22
Feasibility Study - 24 Millpond Lane
Geschlossen·Sep 6
C10112 Walkers/TwoChain Roundabout
Geschlossen·Aug 14
Leeston library demolition & Leeston medical centre refurbishment
Geschlossen·Aug 11
Seatoun Tunnel Repainting
Offen für Angebote·Nov 4
130-140 Grafton Rd Retaining Wall Construction
Offen für Angebote·Nov 4
Main Contractor for the Blocks 2, 3, 4, 8: Replace Failed Door Ranch Sliders and Window Winders at Oteha Valley School
Offen für Angebote·Nov 4
Main Contractor for the Blocks 1, 4, 5, 6, 8: Roofing and Ceiling Tile Works at Oteha Valley School
Offen für Angebote·Nov 4
Main Contractor for the Blocks 1, 3, 4, 8: Roof Works at Glenavon School
Offen für Angebote·Nov 4
Main Contractor for the Block 8: Window Replacement at Glenavon School
Offen für Angebote·Nov 4
Long Range One Way Effector
Offen für Angebote·Nov 5
Craig Road Slip Repair (Whangarei Heads Road RP17940)
Offen für Angebote·Nov 5
Seatoun Tunnel Repainting
Offen für Angebote·Nov 4
130-140 Grafton Rd Retaining Wall Construction
Offen für Angebote·Nov 4
Main Contractor for the Blocks 2, 3, 4, 8: Replace Failed Door Ranch Sliders and Window Winders at Oteha Valley School
Offen für Angebote·Nov 4
Main Contractor for the Blocks 1, 4, 5, 6, 8: Roofing and Ceiling Tile Works at Oteha Valley School
Offen für Angebote·Nov 4
Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.