SPECIFIED SCHEDULE OF REPAIRS AT FLINT LODGE SUDBURY SUFFOLK WORKS REQUIRING LISTED BUILDING CONSENT • Repair and/or replacement of rainwater goods • Repair and repointing to areas of external flintwork • Repair and repointing to areas of external brickwork • Replacement of timber external windows to the single-storey range • Repair where the projecting roof canopy has been removed All works are to be carried out using traditional materials, appropriate conservation techniques and sympathetic detailing to match the existing building fabric and preserve the special architectural and historic interest of the property.
Frist
22.06.2026
Veröffentlicht
22.07.2026
Zuschlag erteilt
22.07.2026
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
CPU 8629 Footway - City Centre Streetscape Resource re Masonry Works
CPU 8627 Western Boulevard Carriageway Resurfacing
Pennyquick Park Play Area
LBH21056 - Greener Homes Initiative 26/27 - Phase 1
CWF Lot 2B - Riverside Corridor, Kendal, Active Travel
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Alle Rechte vorbehalten.