TDC is seeking a qualified and experienced Three Waters contractor who is ready to try their hand at something a bit different – not just construction, but design too. Raw water for treatment at the Temuka Water Treatment Plant is sourced from six bores - three located on the treatment plant site and three located approximately 400-500 metres away near the intersection of Orari Station and Coach Roads. Of the off-site bores, only one is currently in service, and raw water is conveyed to the treatment plant via a single 150mm diameter pipeline. The two other off-site bores are new. Additional raw water conveyance capacity is required to enable supply from the two new off-site bores and to meet increasing demand. There is also a requirement to introduce redundancy into this part of the system. To achieve this, TDC requires the construction of a second raw water pipeline. We want to trial giving you the parameters, and you provide us with the full package – design through construction, testing and completion of the installed pipeline.
Veröffentlicht
08.09.2026
Offen für Angebote
08.09.2026
Frist
05.10.2026
Pūnaha Tautoko Pūkenga – Testing Professional Services
ROI - Otara Wastewater Network Upgrade Design Services
2813 - Stafford Street and Barnard Street Water Services Renewal
Union Street Foxton - Wastewater and Watermain Renewals 2026-27
Greater Greymouth WTP Pre-treatment Upgrade
Katikati Wastewater Outfall Harbour Section Replacement – Early Contractor Involvement
Fleet Maintenance and Repair - Central Lakes
Morrinsville School - Blocks A, C, D, FA (Board), H, J, L, N - Roofing Works
Non-Teaching Staff PLD Panel - Neurodiversity
RFT - Whakatane High School - 5YA Blocks B, G and H Remediation Works
Main Building Contractor for Stage 2 of the Learning Support Fencing project at Waiopehu College
Registration of Interest - Main Contractor for Block 19 (Full) & Block 24, 25 (Partial) Cladding Replacement at St Albans School
© 2026 SIA «Vietne». Alle Rechte vorbehalten.