As Palmerston North’s urban infrastructure continues to expand, the number of Backflow Prevention Devices installed in public parks, municipal buildings, and industrial areas has grown significantly. These devices play a critical role in helping to protect the city’s potable water supply by reducing the risk of cross-contamination with potentially hazardous non-potable sources. Palmerston North City Council (PNCC) is committed to maintaining the highest standards of public health and water safety. To fulfil this responsibility and meet mandatory regulatory obligations under the New Zealand Building Code and Drinking Water Standards, the Council requires a reliable and experienced service provider to undertake the annual testing, maintenance, and repair of approximately 600 Backflow Prevention Devices. Of these, around 5% require testing twice per year. In cases where a device fails testing, the appointed supplier must carry out all necessary remedial works, including technical assessment, provision of a fixed-price quote for parts and labour, and execution of repairs to restore full compliance and functionality. All testing and maintenance activities must be performed by Independently Qualified Persons (IQP) in accordance with current New Zealand regulations and industry best practices.
Veröffentlicht
02.11.2026
Offen für Angebote
02.11.2026
Frist
30.11.2026
PNCC - Waste Water Treatment Plant Seismic Strengthening
Offen für Angebote·Oct 30
PNCC - 26_034 Long Term Asset Valuation
Offen für Angebote·Oct 19
PNCC - 26_047 - Milson Line Water Reservoir Design and Build
Offen für Angebote·Oct 18
PNCC - Parking Management Services
Geschlossen·Sep 17
PNCC Arena Air Dome Facility Design & Build
Geschlossen·Sep 4
PNCC - Napier Road Flume Construction
Geschlossen·Aug 30
Long Range One Way Effector
Offen für Angebote·Nov 5
Craig Road Slip Repair (Whangarei Heads Road RP17940)
Offen für Angebote·Nov 5
Seatoun Tunnel Repainting
Offen für Angebote·Nov 4
130-140 Grafton Rd Retaining Wall Construction
Offen für Angebote·Nov 4
Main Contractor for the Blocks 2, 3, 4, 8: Replace Failed Door Ranch Sliders and Window Winders at Oteha Valley School
Offen für Angebote·Nov 4
Main Contractor for the Blocks 1, 4, 5, 6, 8: Roofing and Ceiling Tile Works at Oteha Valley School
Offen für Angebote·Nov 4
Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.