Napier City Council is undertaking the installation of a new 100mm (125mm OD) watermain on Barker Road and requires the aid of a sub-Contractor to install a new 100mm (125mm OD) watermain pipe using trenchless construction methods while minimising disruption to the surrounding area. In summary, the Scope of Work includes: • Potholing • Excavation of launch and receiving pits. • Supply all drilling plant and equipment. • Pipe welding. • Complete horizontal directional drilling (HDD) along the nominated alignment. • Install the supplied watermain pipe within the drilled bore. • Comply with all project-specific health and safety requirements.
Veröffentlicht
17.08.2026
Offen für Angebote
17.08.2026
Frist
10.09.2026
Fleet Maintenance and Repair - Central Lakes
Morrinsville School - Blocks A, C, D, FA (Board), H, J, L, N - Roofing Works
Non-Teaching Staff PLD Panel - Neurodiversity
RFT - Whakatane High School - 5YA Blocks B, G and H Remediation Works
Main Building Contractor for Stage 2 of the Learning Support Fencing project at Waiopehu College
Registration of Interest - Main Contractor for Block 19 (Full) & Block 24, 25 (Partial) Cladding Replacement at St Albans School
© 2026 SIA «Vietne». Alle Rechte vorbehalten.