The design, manufacture, supply, installation and commissioning of - SGS Phase 5 Control Panel Replacement 2026/27 3 No. MCC dual pump Control Panels and 3 No. Single pump control panels including associated works. Partial decommissioning of MCC on one redundant borehole site. (At the Client's sole discretion, SGS Phase 1 Control Panel Replacement 2027/28 and SGS Phase 2 Control Panel Replacement 2028/29 below may be instructed via Compensation Event) SGS Phase 1 Control Panel Replacement 2027/28 2 No. MCC dual pump Control Panels and 5 No. Single pump control panels including associated works. Partial decommissioning of MCC on one redundant borehole site. SGS Phase 2 Control Panel Replacement 2028/29 1 No. MCC dual pump Control Panels and 8 No. Single pump control panels including associated works.
Frist
13.04.2026
Veröffentlicht
26.06.2026
Zuschlag erteilt
26.06.2026
CDF - Mids - Helpston Remediation ECC
Blaydon Quarry Landfill Gas Monitoring
Mids - AOMR - Lot 1 - Derbyshire Desilts
WMD - Lower Risk Debris Screens - Site Supervisor - CPS Lot 1
SE - SCAPE - 46 Nine Elms Lane Pre-Construction Activities
SE - CPS Lot 1 - 46 Nine Elms Stakeholder Engagement Officer
Procurement of office and IT equipment
T0345 - Dry Dock & Repair of Lightvessel 06
T0345 - Dry Dock & Repair of Lightfloat 03
T0345 - Dry Dock & Repair of Lightvessel 07
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
© 2026 SIA «Vietne». Alle Rechte vorbehalten.