Subject to regulatory approval and owner resolutions, Energie Graz plans to construct an Energetic Sewage Sludge Utilization plant (43.000 t/a mechanically dewatered) on the basis of waste heat recovery using heat pumps, BFB mono-incineration, sewage sludge drying incl. vapor condenser, building, energy distribution, sludge conveying system, dry flue gas cleaning, outdoor facilities, district heating pipeline incl. necessary ancillary services and engineering at the site of City of Graz’ wastewater treatment plant in Gössendorf. The contracting authority explicitly points out that the regulatory approvals have not yet been granted and that all procurement procedures will be carried out subject to committee approval, also due to statutory decision-making requirements. Details will be incl. in the specific tender conditions. Prelim. proposed schedule: Award of contract is expected in: 2026 Start of construction is expected in: 2029 www.energie-graz.at/egg/unternehmen/ekv
Veröffentlicht
24.07.2024
Offen für Angebote
24.07.2024
Frist
31.10.2024
Erneuerung Müllbunker-Tore, Arbeitspaket „WP-110“ // Refurbishment of waste bunker gates, package “WP-110”
Mediaagentur
Generalplaner für die Attraktivierung des Bahnhofs Neufeld an der Leitha
Agreement Eurovision Song Contest 2026
KFN_XXX_5534 Thermodesinfektoren, Waschmaschinen und Trockner
Beschaffung von drei fabriksneuen, batterieelektrisch betriebenen Citybussen für die Mürztaler Verkehrs-Gesellschaft m.b.H.
© 2026 SIA «Vietne». Alle Rechte vorbehalten.