The main purpose with the major overhaul is to ensure that the unit is in a condition where it can be oper-ated safely, reliably and efficiently. Today there are challenges with temperature differences between the lower casing and the upper casing. Scope: The “basic scope of supply” for the IP1 steam turbine major overhaul will include the following main activ-ities: • Cutting of the inlet steam pipe during disassembly and welding during assembly • Disassembly/opening of the steam turbine • Cleaning, blasting, NDT, fact finding, blue checks, measurements (before/after), etc. • Inspection and overhaul of 1 or more bearing(s) • Repairs of findings • Assembly and adjustments • Commissioning, tests and on-site balancing if needed
Veröffentlicht
23.02.2026
Zuschlag erteilt
23.02.2026
Vagtydelser til Fjernvarme Fyn
Geschlossen·Jun 4
Isolation Transformer HAV32
Zuschlag erteilt·Jan 27
Levering af biokedelsand
Zuschlag erteilt·Oct 29
Levering af biokedelsand
Geschlossen·Aug 12
HAV 34/35 150kV kabel, muffer og andet tilbehør
Zuschlag erteilt·Jun 5
Tender for a complete 3-winding transformer 165/10.5/10.5kV with rated power of 100/50/50MVA
Zuschlag erteilt·Sep 26
Håndværkerydelser til drift og vedligeholdelse-glarmesterarbejder 0-5 mio. kr.
Offen für Angebote·Nov 4
Totalrådgivning - Ordrup Gymnasium
Zuschlag erteilt·Nov 4
Udbud af Helheds- og Hjemmepleje til Fredensborg Kommune
Zuschlag erteilt·Nov 4
Indkøb af forsikringer til Holbæk Kommune
Zuschlag erteilt·Nov 4
Totalentreprise – 59 nye almene boliger
Offen für Angebote·Nov 4
Opbygning og levering af drejestiger
Offen für Angebote·Nov 4
Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.