EKFB are looking for a Subcontractor for the design, supply, installation, management and completion of the Claydon Road Overbridge Access Stairs and Hard Slope (hard landscaping) trial works, including all labour, plant, equipment, materials, temporary works, supervision and quality documentation required to deliver the works. Works to include the following elements Review of the proposed product requirements and recommendation of suitable alternatives where applicable. Preparation and submission of shop drawings for acceptance. Supply and installation of: GRP stair panels Posts Hollow blocks Fixings and consumables Paving slabs Edging kerbs Associated stair and hard slope components Installation of aggregate and topsoil in accordance with permanent works specifications. Identification of any exclusions necessary to complete the works. Trial Works will then inform the methodology on how we proceed going forward with further structures within the G2S section of the works, if successful leading to future works. G2S have approximately 29 sets of Access Stairs of various lengths to be supplied and / or installed.
Veröffentlicht
15.09.2026
Offen für Angebote
15.09.2026
Frist
25.09.2026
EKFB JV - NC2A WGT Portal Buildings Blockwork package
EKFB JV - As - Built Surveys
EKFB JV - Waste Management Services
EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - Opportunity
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
Procurement of office and IT equipment
T0345 - Dry Dock & Repair of Lightvessel 06
T0345 - Dry Dock & Repair of Lightfloat 03
T0345 - Dry Dock & Repair of Lightvessel 07
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
© 2026 SIA «Vietne». Alle Rechte vorbehalten.